Timber Frame Houses
Your Home

The best Price by Value in market

HOME MAIL MAP
HC services HC projects HC factory HC technologies About High Casle
 

High Castle™ HC factory HC factory

HC factory

High Castle™ Timber Framed Panel factory is equipped with the most advanced and effective technologies and flexible production capacity. Timber Framed Panels are produced under strict factory controlled conditions to ensure high levels of accuracy and quality.

Item 1 Title

Item 1 Description

Item 2 Title

Item 2 Description

Item 3 Title

Item 3 Description

Item 4 Title

Item 4 Description

Item 5 Title

Item 5 Description

Item 6 Title

Item 6 Description

Item 7 Title

Item 7 Description

Item 8 Title

Item 8 Description

Item 9 Title

Item 9 Description

Item 10 Title

Item 10 Description

Item 11 Title

Item 11 Description

Each panel is checked on multiple occasions to ensure a problem free, on-site panel erection process. Our team of skilled and experienced engineers apply the best practices in Timber Frame Construction from Scandinavia, Germany and North America.

High Performance

High Castle™ timber frame panels are made only from certified materials which comply with the highest quality standards in the industry. Only slow-grown, sustainably sourced Northern European timber is used, ensuring rigidity and eco-friendliness.

Quality control and guarantees:

  • Timber frame is 100% environmentaly friendly method of construction and is thermo efficient consuming far less energy to heat than a conventional masonry house.
  • In the manufacturing process highest level of quality control is ensured to maximise accuracy and quality of the superstructure.
  • Each paneli is checked on multiple occasions to ensure a problem free, on-site panel erection process. All manufactured kits work towards the quality assurance system standarts enshrined in ISO 9001.
  • Every detail of the timber frame superstructure is predesigned and checked for multiple times before the panels are on the production line to ensure maximum accuracy and fast erection process on site.

High Castle™ Standard Timber Frame Package:

  • Tehnical drawings — our expirienced engineers use the most up-to-date software and equipment to design and manufacture each house unit to a very high standart.
  • Transportation to the site — prefabricated panels are carefully loaded and transported to the building site during the panel erection process, therefore minimizing on-site erection costs.
  • Timber frame kit — consists of load - bearing, non load — bearing, sub — floor and roof panels with other materials necessary for erection.
  • Erection — is performed on site within 3 — 4 working days, ensuring the highest quality of panel assembly. Customer handover is smooth and hassle-free.
Recycle Trada NFB

  back

 
MEKLÇT Ipaðumu Speciâlie PIEDÂVÂJUMI Citi IPAÐUMI
High Castle Ltd.
3000 Cathedral Hill
Guildford, GU2 7YB

Phone: +44 (0) 1483 243500
Fax: +44 (0) 1483 243501
info@highcastle.co.uk


© High Castle™ Limited, 2008
Top.LV